Buyer tool
Interface Gap Checklist
Classify what is known, what evidence exists and who must close each technical interface gap.
Make Every Open Boundary Visible
For each category, record whether the condition is known, who owns the next input and what evidence is available. A completed checklist identifies gaps; it does not prove technical closure or acceptance.
- Use current drawings and supplier data.
- Mark assumptions as preliminary.
- Leave missing evidence open.
- Confirm closure through approved records and tests.
Twelve dimensions
Interface Review Register
Complete only what the current evidence supports. The export preserves every open status.
The checklist identifies known inputs and open gaps; technical closure requires approved evidence. Preliminary planning output only. Final engineering and equipment configuration require confirmed water, bottle, output, site and utility data.
From gap list to technical discussion
Send My Gap Summary
Include proposal documents, drawings or equipment records that support the status you selected.