Interface Gap Checklist

Classify what is known, what evidence exists and who must close each technical interface gap.

Engineering Interpretation A gap-finding tool, not an engineering approval

Make Every Open Boundary Visible

For each category, record whether the condition is known, who owns the next input and what evidence is available. A completed checklist identifies gaps; it does not prove technical closure or acceptance.

  • Use current drawings and supplier data.
  • Mark assumptions as preliminary.
  • Leave missing evidence open.
  • Confirm closure through approved records and tests.

Twelve dimensions

Interface Review Register

Complete only what the current evidence supports. The export preserves every open status.

Product-water interfaceWater condition, transfer, storage, cleaning, sampling and interruption evidence.
Bottle interfaceReference drawing, neck/body handling, orientation, quality and transfer evidence.
Cap interfaceClosure specification, supply, presentation, change parts, state and quality checks.
Label interfaceApproved material/artwork basis, application method, coding and inspection boundary.
Pack interfacePack definition, grouping, orientation, transfer and finished-pack acceptance.
Mechanical interfaceTie-in dimensions, elevations, guides, access, guards and machine demarcation.
Utility interfaceApproved terminal conditions, permissible variation, monitoring and start permissives.
Control interfaceState meanings, I/O or data map, ownership, fail response, reset and restart.
Layout interfaceMeasured footprint, access, service zones, routes and expansion tie-ins.
Documentation interfaceDocument list, revisions, owners, approval state and open-data register.
FAT interfaceConnected conditions, reference materials, scenarios, observations and records before shipment.
SAT interfaceSite conditions, connected-machine checks, agreed test basis, results and open issues.

Interface gap summary

Complete the register to generate a result ID, copyable summary, CSV download and inquiry handoff.

The checklist identifies known inputs and open gaps; technical closure requires approved evidence. Preliminary planning output only. Final engineering and equipment configuration require confirmed water, bottle, output, site and utility data.